Rod El-Farag Corridor

Cairo, Egypt

Transport View all Transport projects

The project will connect the existing Cairo Ring Road and the district of Shubra with the Cairo-Alexandria Desert Highway.

Detailed Scope

The key features of the project are likely to include:

  • A design, build, finance, operate and maintain contract of 20 years.
  • A total length of 35 km.
  • Eight lanes, four in each direction.
  • Service road on both sides.
  • Alignment for twin-track light rail.
  • Two major bridges across the River Nile with approximate spans of 300 metres each.
  • About 30 small bridges and embankments.
  • Six major intersections.
  • Tolls.
  • Services buildings.

Photography

Related projects