ARAB CONSULTING ENGINEERS
MOHARRAM - BAKHOUM

      

 

Greater Cairo WasteWater Project

The project objective are to rehabilitate the existing collection system. to build a new collection and convey system of an average daily flow of 1.0 million m3/day, to treat Wastewater to contemporary standards and to reuse treated wastewater beneficially and utilize processed sludge as a soil conditioner/fertilizer
The project is divided into three main areas, East and West Banks of the river Nile and Helwan area.con16.jpg (30298 bytes)

ACE's Role :
- Construction supervision of the east
   bank work.
- Design review and construction
  management of El-Gabal El-Asfr
  Wastewater Treatment Plant.
In association with the American British Consultant of the project (AMBRIC).